Four Mile Run Park – Alexandria, VA
In late April 2021 we completed the picnic table and bike rack installation which included the following:
Sawcut Existing asphalt
Subbase preparation including excavation of gravel/permeable subbase, table and bike rack foundation, grading of swale
2 Nyloplast Basins
1 cleanout
4” diameter Perforated PVC Pipe
675 SF Flexi-Pave pads in color Earl Grey with metal edging
2 picnic tables
3 bike racks