Smithsonian’s National Zoo Asia Trail

Smithsonian’s National Zoo Asia Trail

In May 2021 we finished pouring 32,433 SF of beautiful chocolate brown concrete. We also installed two soft surface play areas as well. Additionally we placed a 22 LF reinforced concrete wall. We also installed 4 concrete drain surrounds, one by the otters location,...
Four Mile Run Park – Alexandria, VA

Four Mile Run Park – Alexandria, VA

In late April 2021 we completed the picnic table and bike rack installation which included the following: Sawcut Existing asphalt Subbase preparation including excavation of gravel/permeable subbase, table and bike rack foundation, grading of swale 2 Nyloplast Basins...
Residential Improvements – Sterling, VA

Residential Improvements – Sterling, VA

In April 2021 we installed a 192 SF Flexi-Pave patio in color Cabernet as well as a 16 SF Flexi-Pave pad at back gate also in color Cabernet. Additionally, 57 SF of All-Stone strips in color River Rock were placed along the driveway. Brick edging was incorporated too....